Skip to content
Ridgeline Towers
Get offer

Direct all-cash buyer · All 50 states

Research · Methodology

How the tower data on this site is produced

Every tower count, height, operator name, and mountaintop flag on Ridgeline Towers comes from public records processed the same way for every state, county, and city page, the tower-owner directory, and the U.S. Cell Tower Land Report 2026. This page describes each step, the filters we apply, and what the data cannot tell you.

By Ridgeline Towers · Updated

Tower records: FCC Antenna Structure Registration

Tower data comes from the FCC’s complete Antenna Structure Registration (ASR) public-access archive (r_tower.zip), downloaded in full on every update rather than patched with daily changes. We read three of its pipe-delimited files: registrations (RA.dat), coordinates (CO.dat), and entities (EN.dat), and join them on the FCC’s unique system identifier. Before anything is loaded, the line count of each file is checked against the archive’s own manifest; a mismatch stops the update.

Which records count

  • Status. We keep registrations with status C (Constructed) and G (Granted). Canceled, dismissed, dismantled, inactive, owner-removed, pending, returned, terminated, and withdrawn registrations are excluded. Granted records are approved but not reported to the FCC as built, and pages that show both say how many are Granted.
  • Coordinates. Each structure is placed at its tower coordinates (coordinate type T), converted from degrees, minutes, and seconds to decimal degrees. Coordinates of individual array members are not used. Records with no tower coordinates, zero coordinates, or out-of-range values are dropped.
  • Safety checks. An update is refused if the number of qualifying records falls more than 2% below the number already published, which protects against a truncated download. Records that disappear from the FCC archive are removed from the site at the end of a successful update.

Fields we use

From each registration we use the ASR number, file number, status, structure type, the registrant-reported construction date, overall height above ground (AGL), overall height above mean sea level (AMSL), ground elevation, and the structure address, county, state, and ZIP as filed. FCC heights are filed in meters; we show them in feet. When the ground elevation field is blank, we use overall height AMSL minus height AGL. ASR numbers on our pages link to the public FCC record.

Structure-type codes are shown in plain language. In the research report they are grouped as lattice towers (LTOWER), monopoles (MTOWER), guyed towers (GTOWER), unspecified towers (TOWER), poles and utility poles, masts, building-mounted structures, water tanks, stealth trees, multi-structure antenna arrays, and records with no type reported.

Registrants and operators

The operator shown for a structure is its FCC registrant: the owner entity on the registration, with its FRN. Large companies register through many subsidiaries and spellings, so names are normalized with fixed rules: legal suffixes such as LLC and Inc. are dropped for display, and known subsidiaries of the largest tower companies and carriers are grouped under their parent. Parent rules were built from the highest-volume names in the archive and checked against each entity’s registered contact email domain; a domain is used as a fallback only where every high-volume name registered under it belongs to the same parent.

States and places

Boundaries come from U.S. Census Bureau TIGER/Line shapefiles for the 50 states, the District of Columbia, and every incorporated place and census-designated place in them. U.S. territories are not covered. Place population is the latest Census Population Estimates Program figure for incorporated places and the 2020 Census count for census-designated places, which the estimates program does not cover. Tier 1 places are those with 50,000 people or more.

Each structure is matched to one place in two passes:

  1. Inside a boundary (EXACT_CONTAINS): the tower point falls inside a place polygon. Where places overlap, an incorporated place wins over a census-designated place, then the smaller place.
  2. Nearby (NEAREST_5MI): otherwise, we find the state polygon that contains the point and assign the nearest place in that same state whose boundary is within 5 miles (geodesic distance).

A structure inside a state but more than 5 miles from any place is counted for the state only (STATE_ONLY). Structures outside every state polygon (offshore or in territories) are not assigned. City pages count both inside and nearby matches, and state pages count all three.

Counties

Counties are the Census county and county-equivalent boundaries (parishes, boroughs, census areas, Connecticut planning regions, and independent cities), with population from the latest Census county estimates or, where unavailable, the 2020 Census. A structure is assigned to the county polygon that contains it, preferring a county in its matched state. Points that fall in water or along a boundary edge go to the nearest county in the same state within 5 miles. Places are assigned to the county that contains their Census internal point.

Elevation and prominence

Terrain comes from AWS Terrain Tiles, which in the United States are built from USGS elevation data. We sample them at zoom 11 (roughly 60 m per pixel at mid-latitudes) with bilinear interpolation. Void pixels in the tiles (values outside Earth’s real elevation range, or isolated spikes more than 1,000 m from their neighbors) are treated as missing.

For each structure we compute its 2-mile prominence:

  1. the terrain-model elevation at the tower point, minus
  2. the average of 64 terrain-model samples on 16 compass bearings at 0.5, 1, 1.5, and 2 miles from the tower.

Both sides of the subtraction come from the same terrain model. If fewer than 56 of the 64 ring samples are valid, the structure gets no prominence and no mountaintop flag rather than a figure from a partial ring.

The ground elevation we show is the FCC-filed figure when it agrees with the terrain model within 150 ft, and the terrain-model figure otherwise.

The mountaintop test

A structure is flagged as a mountaintop site when either holds:

  • its 2-mile prominence is at least 250 ft; or
  • its ground elevation is at least 2,000 ft and its prominence is at least 150 ft.

The lower threshold for high sites reflects the gentler local relief of plateaus and high plains. The thresholds are our own definition, not an FCC or USGS category, and the flag never comes from the FCC record.

Update schedule

A scheduled job runs every week (Sundays, 02:00 UTC). It downloads a fresh FCC archive, reloads the tower records, re-runs place matching for every structure, assigns counties and computes terrain for new structures and any whose coordinates changed, and then recomputes the statistics behind every page. Pages read those statistics live, so they reflect the latest sync without a site rebuild. Census boundaries and population are loaded separately and are not part of the weekly job. Pages that show a sync date take it from the most recent FCC load.

Known limitations

  • Counts undercount real sites. FCC registration is generally required only for structures taller than 200 ft or near airports. Most short monopoles, rooftop sites, small cells, and stealth sites never register, so the true number of wireless sites is much higher than our counts, and a place with zero registered structures can still have many sites.
  • The registrant is not always the current owner. The FCC owner is the entity responsible for the structure. Registrant data can lag sales between companies, and it does not show who owns the land or who pays ground rent.
  • Registration is not a lease. An ASR record says nothing about whether a ground lease exists, what it pays, or which carriers are on the structure.
  • Granted is not built. Some Granted registrations may never be constructed.
  • Filed data can be wrong. Coordinates, heights, types, and addresses are as filed by registrants. We drop records with unusable coordinates and cross-check ground elevation, but we do not correct other fields.
  • The terrain test is a screen, not a survey. A roughly 60 m grid smooths small knolls and cliffs, and a site on a modest hill in flat country can matter for coverage without passing the test.
  • Place matching is geometric. A structure matched to a place may be outside its city limits (within 5 miles), and the name an owner uses for their area may differ from the Census place.

Privacy

When the FCC registrant is a private individual, we never show the name. A registrant is treated as an individual when the owner record has a person’s name and no organization name, or when the organization field has the shape of a personal name with no business words. A sole proprietor filing under a trade name (“doing business as”) is shown only by the trade name. If any registration under a name is identified as an individual, every registration under that name is treated as private. These structures are still counted, but they are left out of operator rankings and the tower-owner directory. Contact email addresses in FCC records are used only to group subsidiaries and are never displayed.

Estimates

Estimates on this site are computed from the owner’s own inputs and internal underwriting assumptions. They are not appraisals, not market data, and not binding offers, and none of the public data described above sets the value of an individual lease or property.

Sources

Ridgeline Towers is not affiliated with the FCC, the Census Bureau, USGS, or any carrier or tower company. Definitions of the terms used here are in the glossary.