Sell the lease
Keep your landElevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
Direct all-cash buyer · All 50 states
Unincorporated community3 registered towers2 mountaintop
Our records show 3 FCC-registered tower structures matched to Farmington, 2 of them on mountaintop terrain. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Franklin County, with 18 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Farmington is high-ground tower country: 2 of its 3 FCC-registered structures meet our mountaintop test, and 3 sites within 10 mi of the community center do. Ground elevation at the sites ranges from 645 ft to 1,060 ft, with a median of 804 ft. 2 of the 3 with a registered height are under 200 ft, and the tallest reaches 313 ft. Array Digital Infrastructure holds the most registrations (2 of 3).
Farmington ranks #72 of the 143 Maine places with registered structures, holding about 0.3% of the state’s 886.
As a Census-designated place, Farmington is an unincorporated community with no legal city limits. 1 structure sits inside its Census boundary, and 2 more are within five miles, closer to Farmington than to any other Census place.
Registered heights average 237 ft, and the tallest reaches 313 ft above ground.
The sites sit at an average ground elevation of 836 ft; the most prominent rises 344 ft above the average terrain within two miles.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 3 structures matched to this community.
Structure type as entered on each FCC registration.
Tallest registered structures
Construction dates are supplied by registrants.
Bars are out of all 3 matched structures.
Terrain at and around the sites
Nearest mountaintop sites to the community center:
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher.
Mountaintop sites
2 registered structures matched to Farmington meet our mountaintop test, the most prominent standing 344 ft above its surroundings. Within 10 mi of the community center, we count 3 mountaintop sites in all.
Our test: the ground at the tower is at least 250 ft above the average terrain within two miles, or at least 150 ft above it where the site is at 2,000 ft elevation or higher.
| ASR # | Structure | Height | Operator | Ground elev. | Distance | Terrain |
|---|---|---|---|---|---|---|
| 1246100 (FCC record, opens in a new tab) | Lattice tower | 199 ft | Array Digital Infrastructure | 804 ft | 1.4 mi | Mountaintop257 ft above local terrain |
| 1020680 (FCC record, opens in a new tab) | Guyed tower | 313 ft | Array Digital Infrastructure | 1,060 ft | 2.8 mi | Mountaintop344 ft above local terrain |
| 1276673 (FCC record, opens in a new tab) | Lattice tower | 255 ft | Array Digital Infrastructure | 856 ft | 6.9 mi | Mountaintop345 ft above local terrain |
Own a home or land on one of these ridgelines? Selling a house or land with a tower in Maine explains how the tower affects a sale.
FCC records
Operators below include Array Digital Infrastructure and American Tower. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1020680 (FCC record, opens in a new tab) | Guyed tower | 313 ft | Array Digital Infrastructure | 1,060 ft | Mountaintop344 ft above local terrain |
| 1246100 (FCC record, opens in a new tab) | Lattice tower | 199 ft | Array Digital Infrastructure | 804 ft | Mountaintop257 ft above local terrain |
| 1305948 (FCC record, opens in a new tab) | Lattice tower | 199 ft | American Tower | 645 ft | +133 ft vs. local terrain |
Your options
Elevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
Unincorporated and rural parcels are welcome. We buy the home or land with the tower easement in place, so you do not need to resolve it first.
FAQ
Our records show 3 FCC-registered antenna structures matched to Farmington, 1 inside the Census-designated boundary and the rest within five miles, including 2 on mountaintop terrain. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this community is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
We flag a tower as mountaintop when its ground sits at least 250 ft above the average terrain within two miles, or 150 ft above it at 2,000 ft elevation or higher. By that measure, 2 registered structures matched to Farmington meet that test. High ground covers more area, one reason carriers value these sites.
Of the 3 FCC-registered structures matched to Farmington, 2 are lattice towers and 1 is a guyed tower. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 2 are 100 to 199 ft and 1 is 300 to 499 ft. The tallest, ASR 1020680, is 313 ft and registered to Array Digital Infrastructure. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Registrants report a construction date for 3 of the 3 structures matched to Farmington. The 2010s and 2000s tie for the most, with 1 each. The build date describes the structure, not your lease; the lease’s own start date and renewal terms are what matter in a sale.
Nearby markets
Distances are between place centers. All Maine cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.