Sell the lease
Keep your landElevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
Direct all-cash buyer · All 50 states
Village in New York2 registered towersMountaintop sites nearby
Our records show 2 FCC-registered tower structures matched to Johnson City. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Johnson City ranks #367 of the 844 New York places with registered structures.
1 stands inside village limits; the other 1 is within five miles of the village and closer to Johnson City than to any other Census place.
Registered heights average 134 ft, and the tallest reaches 140 ft above ground.
The sites sit at an average ground elevation of 1,171 ft; the most prominent rises 154 ft above the average terrain within two miles.
Mountaintop sites
No structure matched to Johnson City itself meets our mountaintop test, but at least 25 registered sites within 10 mi of the village center do.
Our test: the ground at the tower is at least 250 ft above the average terrain within two miles, or at least 150 ft above it where the site is at 2,000 ft elevation or higher.
| ASR # | Structure | Height | Operator | Ground elev. | Distance | Terrain |
|---|---|---|---|---|---|---|
| 1006937 (FCC record, opens in a new tab) | Free-standing or guyed tower | 194 ft | T & K Communications Systems | 1,508 ft | 2.2 mi | Mountaintop405 ft above local terrain |
| 1006942 (FCC record, opens in a new tab) | Free-standing or guyed tower | 175 ft | TowerCo | 1,810 ft | 4.3 mi | Mountaintop311 ft above local terrain |
| 1243032 (FCC record, opens in a new tab) | Lattice tower | 155 ft | Upstate Tower Holdings | 1,384 ft | 4.3 mi | Mountaintop348 ft above local terrain |
| 1318742 (FCC record, opens in a new tab) | Lattice tower | 220 ft | Broome County Office of Emergency Services | 1,835 ft | 4.4 mi | Mountaintop402 ft above local terrain |
| 1006100 (FCC record, opens in a new tab) | Free-standing or guyed tower | 212 ft | New York State Electric & Gas | 1,718 ft | 4.4 mi | Mountaintop307 ft above local terrain |
| 1017801 (FCC record, opens in a new tab) | Free-standing or guyed tower | 299 ft | Crown Castle | 1,699 ft | 4.5 mi | Mountaintop294 ft above local terrain |
| 1003210 (FCC record, opens in a new tab) | Antenna tower array (1 of 5) | 205 ft | Vertical Bridge | 1,365 ft | 4.5 mi | Mountaintop301 ft above local terrain |
| 1236974 (FCC record, opens in a new tab) | Guyed tower | 950 ft | TowerCo | 1,706 ft | 4.5 mi | Mountaintop270 ft above local terrain |
| 1003209 (FCC record, opens in a new tab) | Antenna tower array (2 of 5) | 205 ft | Vertical Bridge | 1,365 ft | 4.5 mi | Mountaintop299 ft above local terrain |
| 1007060 (FCC record, opens in a new tab) | Guyed tower | 559 ft | Nexstar Media | 1,692 ft | 4.6 mi | Mountaintop263 ft above local terrain |
Own a home or land on one of these ridgelines? Selling a house or land with a tower in New York explains how the tower affects a sale.
FCC records
Operators below include New York State Electric & Gas and SBA Communications. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1286305 (FCC record, opens in a new tab) | Monopole | 140 ft | New York State Electric & Gas | 1,386 ft | +154 ft vs. local terrain |
| 1287733 (FCC record, opens in a new tab) | Monopole | 127 ft | SBA Communications | 955 ft | −133 ft vs. local terrain |
Your options
Elevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 2 FCC-registered antenna structures matched to Johnson City, 1 inside village limits and the rest within five miles. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this village is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
We flag a tower as mountaintop when its ground sits at least 250 ft above the average terrain within two miles, or 150 ft above it at 2,000 ft elevation or higher. By that measure, at least 25 registered structures within 10 mi of Johnson City meet that test. High ground covers more area, one reason carriers value these sites.
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.