Sell the lease
Keep your landSell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Direct all-cash buyer · All 50 states
City in South Carolina22 registered towers
Our records show 22 FCC-registered tower structures matched to Cayce. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Lexington County, with 184 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Most of the 22 FCC-registered structures matched to Cayce are towers listed only as free-standing or guyed: 12 of 22, or 55%. 16 of the 22 with a registered height are under 200 ft, and the tallest reaches 330 ft. Crown Castle holds the most registrations (6 of 22). The most common reported construction decade is the 1990s (9 of 18 dated structures).
Cayce ranks #22 of the 450 South Carolina places with registered structures, holding about 0.6% of the state’s 3,765.
10 stand inside city limits; the other 12 are within five miles of the city and closer to Cayce than to any other Census place.
Registered heights average 164 ft, and the tallest reaches 330 ft above ground.
The sites sit at an average ground elevation of 216 ft; the most prominent rises 77 ft above the average terrain within two miles.
4 registrations are granted but not yet reported to the FCC as constructed, so 18 are recorded as standing.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 22 structures matched to this city.
Structure type as entered on each FCC registration.
Tallest registered structures
Construction dates are supplied by registrants. 4 structures have no date on file and are not shown.
Bars are out of all 22 matched structures. 4 more belong to other organizations.
Terrain at and around the sites
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher.
FCC records
Operators below include Glory Communications, SBA Communications, and Crown Castle. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1212031 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 330 ft | Glory Communications | 135 ft | −15 ft vs. local terrain |
| 1212033 (FCC record, opens in a new tab) | Free-standing or guyed tower | 330 ft | Glory Communications | 135 ft | −15 ft vs. local terrain |
| 1263688 (FCC record, opens in a new tab) | Lattice tower | 255 ft | SBA Communications | 136 ft | −14 ft vs. local terrain |
| 1045952 (FCC record, opens in a new tab) | Free-standing or guyed tower | 226 ft | Crown Castle | 224 ft | +35 ft vs. local terrain |
| 1048318 (FCC record, opens in a new tab) | Free-standing or guyed tower | 222 ft | Verizon | 214 ft | −28 ft vs. local terrain |
| 1048051 (FCC record, opens in a new tab) | Lattice tower | 206 ft | American Tower | 184 ft | −10 ft vs. local terrain |
| 1296940 (FCC record, opens in a new tab) | Monopole | 196 ft | SBA Communications | 137 ft | −12 ft vs. local terrain |
| 1010107 (FCC record, opens in a new tab) | Pole | 195 ft | Crown Castle | 157 ft | −14 ft vs. local terrain |
| 1224210 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 194 ft | Directowers | 182 ft | −6 ft vs. local terrain |
| 1291233 (FCC record, opens in a new tab) | Monopole | 170 ft | American Tower | 202 ft | +5 ft vs. local terrain |
Your options
Sell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 22 FCC-registered antenna structures matched to Cayce, 10 inside city limits and the rest within five miles. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this city is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
Crown Castle is the most common registered operator among the 22 FCC-registered structures matched to Cayce. The remaining structures are registered to other operators, utilities, broadcasters, and public agencies. The operator named on the FCC record is not always the carrier paying your rent, so your lease and recent rent checks are the best guide to who your tenant is.
Of the 22 FCC-registered structures matched to Cayce, 12 are towers listed only as free-standing or guyed, 4 are pole or pipe mounts, 3 are lattice towers, and 3 are other types. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 6 are under 100 ft, 10 are 100 to 199 ft, 4 are 200 to 299 ft, and 2 are 300 to 499 ft. The tallest, ASR 1212031, is 330 ft and registered to Glory Communications. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Registrants report a construction date for 18 of the 22 structures matched to Cayce. The most common decade is the 1990s, with 9, followed by the 2000s with 4. 4 have no construction date on file. The build date describes the structure, not your lease; the lease’s own start date and renewal terms are what matter in a sale.
Nearby markets
Distances are between place centers. All South Carolina cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.