Sell the lease
Keep your landSell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Direct all-cash buyer · All 50 states
Unincorporated community3 registered towers
Our records show 3 FCC-registered tower structures matched to Antelope. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Todd County, with 10 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Most of the 3 FCC-registered structures matched to Antelope are towers listed only as free-standing or guyed: 3 of 3, or 100%. 2 of the 3 with a registered height stand 200 ft or more above ground; the tallest reaches 285 ft. Cherry Todd Electric Cooperative holds the most registrations (1 of 3).
Antelope ranks #56 of the 301 South Dakota places with registered structures, holding about 0.3% of the state’s 1,101.
As a Census-designated place, Antelope is an unincorporated community with no legal city limits. None of the matched structures sit inside its Census boundary, and 3 more are within five miles, closer to Antelope than to any other Census place.
Registered heights average 233 ft, and the tallest reaches 285 ft above ground.
The sites sit at an average ground elevation of 2,760 ft; the most prominent rises 120 ft above the average terrain within two miles.
One registration is granted but not yet reported to the FCC as constructed, so 2 are recorded as standing.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 3 structures matched to this community.
Structure type as entered on each FCC registration.
Tallest registered structures
Bars are out of all 3 matched structures.
Terrain at and around the sites
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher.
FCC records
Operators below include Cherry Todd Electric Cooperative, Verizon, and Integrated Tower Networks. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1283693 (FCC record, opens in a new tab) | Free-standing or guyed tower | 285 ft | Cherry Todd Electric Cooperative | 2,789 ft | +86 ft vs. local terrain |
| 1281480 (FCC record, opens in a new tab) | Free-standing or guyed tower | 214 ft | Verizon | 2,771 ft | +120 ft vs. local terrain |
| 1238805 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 199 ft | Integrated Tower Networks | 2,720 ft | +82 ft vs. local terrain |
Your options
Sell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Unincorporated and rural parcels are welcome. We buy the home or land with the tower easement in place, so you do not need to resolve it first.
FAQ
Our records show 3 FCC-registered antenna structures matched to Antelope, all just outside the community, within five miles of its boundary. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this community is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
Cherry Todd Electric Cooperative is the most common registered operator among the 3 FCC-registered structures matched to Antelope. The remaining structures are registered to other operators, utilities, broadcasters, and public agencies. The operator named on the FCC record is not always the carrier paying your rent, so your lease and recent rent checks are the best guide to who your tenant is.
Of the 3 FCC-registered structures matched to Antelope, 3 are towers listed only as free-standing or guyed. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 1 is 100 to 199 ft and 2 are 200 to 299 ft. The tallest, ASR 1283693, is 285 ft and registered to Cherry Todd Electric Cooperative. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Ground elevation at the 3 registered sites runs from 2,720 ft to 2,789 ft, with a median of 2,771 ft. No registered site within 10 mi of the center meets our mountaintop test. Elevations come from FCC records and national elevation models.
Nearby markets
Distances are between place centers. All South Dakota cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.