Sell the lease
Keep your landElevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
Direct all-cash buyer · All 50 states
City in Wisconsin10 registered towersMountaintop sites nearby
Our records show 10 FCC-registered tower structures matched to Adams. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Adams ranks #77 of the 757 Wisconsin places with registered structures, holding about 0.2% of the state’s 4,363.
7 stand inside city limits; the other 3 are within five miles of the city and closer to Adams than to any other Census place.
Registered heights average 160 ft, and the tallest reaches 343 ft above ground.
The sites sit at an average ground elevation of 965 ft; the most prominent rises 10 ft above the average terrain within two miles.
One registration is granted but not yet reported to the FCC as constructed, so 9 are recorded as standing.
Mountaintop sites
No structure matched to Adams itself meets our mountaintop test, but 2 registered sites within 10 mi of the city center do.
Our test: the ground at the tower is at least 250 ft above the average terrain within two miles, or at least 150 ft above it where the site is at 2,000 ft elevation or higher.
| ASR # | Structure | Height | Operator | Ground elev. | Distance | Terrain |
|---|---|---|---|---|---|---|
| 1234437 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 105 ft | Adams County of | 1,365 ft | 2.2 mi | Mountaintop281 ft above local terrain |
| 1243017 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 174 ft | Adams Columbia Electric Cooperative | 1,246 ft | 2.3 mi | Mountaintop272 ft above local terrain |
Own a home or land on one of these ridgelines? Selling a house or land with a tower in Wisconsin explains how the tower affects a sale.
FCC records
Operators below include Heart of Wisconsin Media, Adams County Sheriffs Department, and Array Digital Infrastructure. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1035759 (FCC record, opens in a new tab) | Free-standing or guyed tower | 343 ft | Heart of Wisconsin Media | 950 ft | −2 ft vs. local terrain |
| 1264966 (FCC record, opens in a new tab) | Free-standing or guyed tower | 322 ft | Adams County Sheriffs Department | 958 ft | +1 ft vs. local terrain |
| 1229315 (FCC record, opens in a new tab) | Guyed tower | 214 ft | Array Digital Infrastructure | 963 ft | +7 ft vs. local terrain |
| 1289723 (FCC record, opens in a new tab) | Monopole | 145 ft | Array Digital Infrastructure | 952 ft | +1 ft vs. local terrain |
| 1217271 (FCC record, opens in a new tab) | Lattice tower | 144 ft | Octagon Towers | 967 ft | +5 ft vs. local terrain |
| 1279159 (FCC record, opens in a new tab) | Lattice tower | 125 ft | Union Pacific Railroad | 948 ft | −4 ft vs. local terrain |
| 1293463 (FCC record, opens in a new tab) | Guyed tower | 100 ft | Riesterer & Schnell | 965 ft | +5 ft vs. local terrain |
| 1058857 (FCC record, opens in a new tab) | Free-standing or guyed tower | 89 ft | Wisconsin State of | 951 ft | −10 ft vs. local terrain |
| 1215630 (FCC record, opens in a new tab)Granted, not yet built | Building with tower | 62 ft | Adams County Fire District | 1,033 ft | −2 ft vs. local terrain |
| 1245500 (FCC record, opens in a new tab) | Free-standing or guyed tower | 57 ft | Pingel Enterprise | 962 ft | +10 ft vs. local terrain |
Your options
Elevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 10 FCC-registered antenna structures matched to Adams, 7 inside city limits and the rest within five miles. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this city is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
We flag a tower as mountaintop when its ground sits at least 250 ft above the average terrain within two miles, or 150 ft above it at 2,000 ft elevation or higher. By that measure, 2 registered structures within 10 mi of Adams meet that test. High ground covers more area, one reason carriers value these sites.
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.