Sell the lease
Keep your landSell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Direct all-cash buyer · All 50 states
City in Wisconsin12 registered towers
Our records show 12 FCC-registered tower structures matched to Platteville. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Grant County, with 73 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Platteville has 12 FCC-registered antenna structures, a mix led by towers listed only as free-standing or guyed (4), lattice towers (3), and monopoles (2). Array Digital Infrastructure holds the most registrations (2 of 12). 8 of the 12 with a registered height stand 200 ft or more above ground; the tallest reaches 313 ft. Ground elevation at the sites ranges from 927 ft to 1,273 ft, with a median of 974 ft.
Platteville ranks #56 of the 757 Wisconsin places with registered structures, holding about 0.3% of the state’s 4,363.
3 stand inside city limits; the other 9 are within five miles of the city and closer to Platteville than to any other Census place.
Registered heights average 224 ft, and the tallest reaches 313 ft above ground.
The sites sit at an average ground elevation of 1,018 ft; the most prominent rises 161 ft above the average terrain within two miles.
One registration is granted but not yet reported to the FCC as constructed, so 11 are recorded as standing.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 12 structures matched to this city.
Structure type as entered on each FCC registration.
Tallest registered structures
Construction dates are supplied by registrants. 1 structure has no date on file and is not shown.
Bars are out of all 12 matched structures. 6 more belong to other organizations.
Terrain at and around the sites
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher.
FCC records
Operators below include Crown Castle, Richland Telecom Towers A, and Neit Properties. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1037051 (FCC record, opens in a new tab) | Free-standing or guyed tower | 313 ft | Crown Castle | 972 ft | +6 ft vs. local terrain |
| 1227504 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 308 ft | Richland Telecom Towers A | 927 ft | +97 ft vs. local terrain |
| 1321626 (FCC record, opens in a new tab) | Guyed tower | 305 ft | Neit Properties | 1,001 ft | +22 ft vs. local terrain |
| 1047770 (FCC record, opens in a new tab) | Lattice tower | 293 ft | Array Digital Infrastructure | 1,264 ft | +161 ft vs. local terrain |
| 1054123 (FCC record, opens in a new tab) | Lattice tower | 271 ft | Vertical Bridge | 976 ft | −2 ft vs. local terrain |
| 1033964 (FCC record, opens in a new tab) | Free-standing or guyed tower | 264 ft | Verizon | 1,273 ft | +161 ft vs. local terrain |
| 1230580 (FCC record, opens in a new tab) | Free-standing or guyed tower | 260 ft | Communication Enhancement | 962 ft | +0 ft vs. local terrain |
| 1322701 (FCC record, opens in a new tab) | Lattice tower | 259 ft | Grant County Sheriff S Office | 964 ft | +18 ft vs. local terrain |
| 1259165 (FCC record, opens in a new tab) | Monopole | 185 ft | Array Digital Infrastructure | 927 ft | +13 ft vs. local terrain |
| 1318465 (FCC record, opens in a new tab) | Monopole | 150 ft | TowerNorth | 931 ft | −36 ft vs. local terrain |
Your options
Sell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 12 FCC-registered antenna structures matched to Platteville, 3 inside city limits and the rest within five miles. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this city is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
Array Digital Infrastructure is the most common registered operator among the 12 FCC-registered structures matched to Platteville. The remaining structures are registered to other operators, utilities, broadcasters, and public agencies. The operator named on the FCC record is not always the carrier paying your rent, so your lease and recent rent checks are the best guide to who your tenant is.
Of the 12 FCC-registered structures matched to Platteville, 4 are towers listed only as free-standing or guyed, 3 are lattice towers, 2 are monopoles, and 3 are other types. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 2 are under 100 ft, 2 are 100 to 199 ft, 5 are 200 to 299 ft, and 3 are 300 to 499 ft. The tallest, ASR 1037051, is 313 ft and registered to Crown Castle. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Registrants report a construction date for 11 of the 12 structures matched to Platteville. The 2020s and 2000s tie for the most, with 3 each. 1 has no construction date on file. The build date describes the structure, not your lease; the lease’s own start date and renewal terms are what matter in a sale.
Nearby markets
Distances are between place centers. All Wisconsin cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.