Sell the lease
Keep your landSell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Direct all-cash buyer · All 50 states
City in Arkansas10 registered towers
Our records show 10 FCC-registered tower structures matched to Booneville. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Logan County, with 31 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Most of the 10 FCC-registered structures matched to Booneville are lattice towers: 6 of 10, or 60%. 8 of the 10 with a registered height stand 200 ft or more above ground; the tallest reaches 354 ft. Southwestern Electric Power holds the most registrations (2 of 10). The most common reported construction decade is the 2020s (4 of 9 dated structures).
Booneville ranks #71 of the 545 Arkansas places with registered structures, holding about 0.3% of the state’s 3,406.
2 stand inside city limits; the other 8 are within five miles of the city and closer to Booneville than to any other Census place.
Registered heights average 265 ft, and the tallest reaches 354 ft above ground.
The sites sit at an average ground elevation of 631 ft; the most prominent rises 189 ft above the average terrain within two miles.
One registration is granted but not yet reported to the FCC as constructed, so 9 are recorded as standing.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 10 structures matched to this city.
Structure type as entered on each FCC registration.
Tallest registered structures
Construction dates are supplied by registrants. 1 structure has no date on file and is not shown.
Bars are out of all 10 matched structures. 3 more belong to other organizations.
Terrain at and around the sites
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher. How we count.
FCC records
Operators below include Tillman Infrastructure, Southwestern Electric Power, and AT&T. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1313144 (FCC record, opens in a new tab) | Guyed tower | 354 ft | Tillman Infrastructure | 810 ft | +123 ft vs. local terrain |
| 1329840 (FCC record, opens in a new tab)Granted, not yet built | Lattice tower | 350 ft | Southwestern Electric Power | 488 ft | −54 ft vs. local terrain |
| 1038481 (FCC record, opens in a new tab) | Free-standing or guyed tower | 319 ft | AT&T | 838 ft | +143 ft vs. local terrain |
| 1307794 (FCC record, opens in a new tab) | Lattice tower | 270 ft | Vertical Bridge | 566 ft | +14 ft vs. local terrain |
| 1326589 (FCC record, opens in a new tab) | Lattice tower | 267 ft | Tillman Infrastructure | 458 ft | −31 ft vs. local terrain |
| 1249814 (FCC record, opens in a new tab) | Lattice tower | 256 ft | SBA Communications | 573 ft | +18 ft vs. local terrain |
| 1038172 (FCC record, opens in a new tab) | Lattice tower | 237 ft | Connect Holding | 763 ft | +101 ft vs. local terrain |
| 1040861 (FCC record, opens in a new tab) | Free-standing or guyed tower | 233 ft | Booneville Human Development Center | 740 ft | +189 ft vs. local terrain |
| 1310800 (FCC record, opens in a new tab) | Lattice tower | 199 ft | Verizon | 497 ft | −20 ft vs. local terrain |
| 1051432 (FCC record, opens in a new tab) | Pole | 163 ft | Southwestern Electric Power | 580 ft | +35 ft vs. local terrain |
Your options
Sell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 10 FCC-registered antenna structures matched to Booneville, 2 inside city limits and the rest within five miles. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this city is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
Southwestern Electric Power is the most common registered operator among the 10 FCC-registered structures matched to Booneville. The remaining structures are registered to other operators, utilities, broadcasters, and public agencies. The operator named on the FCC record is not always the carrier paying your rent, so your lease and recent rent checks are the best guide to who your tenant is.
Of the 10 FCC-registered structures matched to Booneville, 6 are lattice towers, 2 are towers listed only as free-standing or guyed, 1 is a guyed tower, and 1 is other types. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 2 are 100 to 199 ft, 5 are 200 to 299 ft, and 3 are 300 to 499 ft. The tallest, ASR 1313144, is 354 ft and registered to Tillman Infrastructure. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Registrants report a construction date for 9 of the 10 structures matched to Booneville. The most common decade is the 2020s, with 4, followed by the 2000s with 2. 1 has no construction date on file. The build date describes the structure, not your lease; the lease’s own start date and renewal terms are what matter in a sale.
Nearby markets
Distances are between place centers. All Arkansas cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.