Sell the lease
Keep your landElevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
Direct all-cash buyer · All 50 states
City in California5 registered towers1 mountaintop
Our records show 5 FCC-registered tower structures matched to California City, 1 of them on mountaintop terrain. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Kern County, with 381 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
California City is high-ground tower country: 1 of its 5 FCC-registered structures meets our mountaintop test, and 0 sites within 10 mi of the city center do. Ground elevation at the sites ranges from 2,360 ft to 2,828 ft, with a median of 2,405 ft. 5 of the 5 with a registered height are under 200 ft, and the tallest reaches 199 ft. BNSF Railway holds the most registrations (1 of 5).
California City ranks #313 of the 992 California places with registered structures.
4 stand inside city limits; the other 1 is within five miles of the city and closer to California City than to any other Census place.
Registered heights average 99 ft, and the tallest reaches 199 ft above ground.
The sites sit at an average ground elevation of 2,532 ft; the most prominent rises 189 ft above the average terrain within two miles.
One registration is granted but not yet reported to the FCC as constructed, so 4 are recorded as standing.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 5 structures matched to this city.
Structure type as entered on each FCC registration.
Tallest registered structures
Construction dates are supplied by registrants. 1 structure has no date on file and is not shown.
Bars are out of all 5 matched structures.
Terrain at and around the sites
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher. How we count.
Mountaintop sites
1 registered structure matched to California City meets our mountaintop test, the most prominent standing 189 ft above its surroundings.
Our test: the ground at the tower is at least 250 ft above the average terrain within two miles (its prominence), or at least 150 ft above it where the site is at 2,000 ft elevation or higher.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1017110 (FCC record, opens in a new tab) | Free-standing or guyed tower | 199 ft | Crown Castle | 2,828 ft | Mountaintop189 ft above local terrain |
Own a home or land on one of these ridgelines? Selling a house or land with a tower in California explains how the tower affects a sale.
FCC records
Operators below include Crown Castle, Vertical Bridge, and T-Mobile. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1017110 (FCC record, opens in a new tab) | Free-standing or guyed tower | 199 ft | Crown Castle | 2,828 ft | Mountaintop189 ft above local terrain |
| 1334741 (FCC record, opens in a new tab)Granted, not yet built | Monopole | 86 ft | Vertical Bridge | 2,401 ft | −3 ft vs. local terrain |
| 1288423 (FCC record, opens in a new tab) | Monopole | 81 ft | T-Mobile | 2,360 ft | −5 ft vs. local terrain |
| 1328329 (FCC record, opens in a new tab) | Monopole | 80 ft | Verizon | 2,669 ft | +3 ft vs. local terrain |
| 1279449 (FCC record, opens in a new tab) | Free-standing or guyed tower | 50 ft | BNSF Railway | 2,405 ft | −25 ft vs. local terrain |
Your options
Elevated sites tend to be hard for carriers to replace, which can matter when a lease is priced. Sell the remaining rent for one payment and keep your land.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 5 FCC-registered antenna structures matched to California City, 4 inside city limits and the rest within five miles, including 1 on mountaintop terrain. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this city is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
We flag a tower as mountaintop when its ground sits at least 250 ft above the average terrain within two miles, or 150 ft above it at 2,000 ft elevation or higher. By that measure, 1 registered structure matched to California City meets that test. High ground covers more area, one reason carriers value these sites.
Of the 5 FCC-registered structures matched to California City, 3 are monopoles and 2 are towers listed only as free-standing or guyed. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 4 are under 100 ft and 1 is 100 to 199 ft. The tallest, ASR 1017110, is 199 ft and registered to Crown Castle. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Registrants report a construction date for 4 of the 5 structures matched to California City. The 2020s and 2010s tie for the most, with 1 each. 1 has no construction date on file. The build date describes the structure, not your lease; the lease’s own start date and renewal terms are what matter in a sale.
Nearby markets
Distances are between place centers. All California cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.