Sell the lease
Keep your landSell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Direct all-cash buyer · All 50 states
County in Georgia28 registered towers
Early County, GA has 28 FCC-registered tower structures; American Tower registers the most (3), and the tallest stands 483 ft above ground.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Registered structures are matched to 4 Census places in this county, led by Blakely (13), Jakin (4), and Cedar Springs (3).
Registered heights average 260 ft, and the tallest reaches 483 ft above ground.
Tower sites sit at an average ground elevation of 219 ft, up to 307 ft.
4 registrations are granted but not yet reported to the FCC as constructed.
The county has 10,455 residents (Census 2025 estimate) across 513 square miles of land.
Operators
Structure owners as registered with the FCC, private individuals excluded. A tower company often owns the structure while leasing the ground beneath it from a landowner.
| Operator | Structures | Share |
|---|---|---|
| American Tower | 3 | 10.7% |
| Verizon | 3 | 10.7% |
| Crown Castle | 2 | 7.1% |
| Tarpon Towers | 2 | 7.1% |
| Us Army Corps of Engineers | 2 | 7.1% |
The company paying your rent may be one of these operators, a carrier, or a smaller ground-lease investor. Your lease and rent checks name the tenant.
Want a modeled range for your own lease? Use the lease buyout calculator.
FCC records
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1020045 (FCC record, opens in a new tab) | Guyed tower | 483 ft | Verizon | 191 ft | +11 ft vs. local terrain |
| 1056214 (FCC record, opens in a new tab) | Free-standing or guyed tower | 351 ft | Styles Alabama Licensing | 217 ft | +9 ft vs. local terrain |
| 1002618 (FCC record, opens in a new tab) | Free-standing or guyed tower | 350 ft | Alabama Media | 218 ft | +17 ft vs. local terrain |
| 1214715 (FCC record, opens in a new tab) | Guyed tower | 328 ft | American Tower | 270 ft | −17 ft vs. local terrain |
| 1309346 (FCC record, opens in a new tab) | Guyed tower | 320 ft | Horvath Communications | 217 ft | +24 ft vs. local terrain |
| 1311651 (FCC record, opens in a new tab) | Guyed tower | 320 ft | K2 Towers | 240 ft | +40 ft vs. local terrain |
| 1311889 (FCC record, opens in a new tab) | Guyed tower | 320 ft | Nextower Development Group II | 195 ft | +10 ft vs. local terrain |
| 1264249 (FCC record, opens in a new tab)Granted, not yet built | Free-standing or guyed tower | 315 ft | Vantage Tower Group | 184 ft | +15 ft vs. local terrain |
| 1311618 (FCC record, opens in a new tab) | Lattice tower | 315 ft | CitySwitch | 187 ft | +16 ft vs. local terrain |
| 1314435 (FCC record, opens in a new tab) | Lattice tower | 310 ft | Diamond Communications | 239 ft | +33 ft vs. local terrain |
Cities and towns
Census places whose center lies in Early County. Each links to a page with that place’s towers, operators, and terrain.
| City or town | Towers | Population | Type |
|---|---|---|---|
| Blakely | 13 | 5,156 | City |
| Jakin | 4 | 134 | City |
| Cedar Springs | 3 | 75 | Community (CDP) |
| Damascus | 2 | 200 | City |
Your options
Sell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
We buy the home, lot, or acreage with the tower easement in place, including rural and unincorporated parcels. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 28 FCC-registered antenna structures inside Early County. 24 are reported to the FCC as constructed; the rest are granted but not yet reported built. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites in this county is higher.
The largest registered structure owners in Early County are American Tower (3), Verizon (3), and Crown Castle (2), by count of FCC registrations. The owner on an FCC record holds the structure; it is not always the company paying ground rent, so your lease and recent rent checks are the best guide to who your tenant is.
The tallest FCC-registered structure in Early County is ASR 1020045, registered at 483 ft above ground, on ground at 191 ft elevation (guyed tower), owned by Verizon. Registered structures are matched to 4 Census places in the county, led by Blakely.
Yes. A tower lease or easement usually stays with the land and transfers to the buyer, which some buyers and lenders find unfamiliar. We buy as-is, tower easement and all, and can buy the whole property or only the lease income.
Neighboring counties
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.