Sell the lease
Keep your landSell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
Direct all-cash buyer · All 50 states
Village in Wisconsin5 registered towers
Our records show 5 FCC-registered tower structures matched to Hollandale. If one stands on your land, you can sell the lease income and keep the property, or sell the property with the tower in place.
Located in Iowa County, with 49 registered towers countywide.
Enter the property address. We check it against the FCC’s registered structures within 500 m.
Wireless infrastructure
Most of the 5 FCC-registered structures matched to Hollandale are guyed towers: 3 of 5, or 60%. 3 of the 5 with a registered height stand 200 ft or more above ground; the tallest reaches 305 ft. Boldyn Networks holds the most registrations (2 of 5). The most common reported construction decade is the 2010s (2 of 3 dated structures).
Hollandale ranks #206 of the 757 Wisconsin places with registered structures, holding about 0.1% of the state’s 4,363.
None stand inside village limits; the other 5 are within five miles of the village and closer to Hollandale than to any other Census place.
Registered heights average 246 ft, and the tallest reaches 305 ft above ground.
The sites sit at an average ground elevation of 1,129 ft; the most prominent rises 130 ft above the average terrain within two miles.
2 registrations are granted but not yet reported to the FCC as constructed, so 3 are recorded as standing.
Local tower profile
Structure types, heights, build dates, owners, and terrain for the 5 structures matched to this village.
Structure type as entered on each FCC registration.
Tallest registered structures
Construction dates are supplied by registrants. 2 structures have no date on file and are not shown.
Bars are out of all 5 matched structures.
Terrain at and around the sites
Counts are FCC Antenna Structure Registration (ASR) records. Most short monopoles and rooftop sites are not required to register, so the true number of sites is higher. How we count.
FCC records
Operators below include Boldyn Networks, Array Digital Infrastructure, and MH Telecom. The operator on an FCC record owns the structure; it is not always the company paying ground rent.
| ASR # | Structure | Height | Operator | Ground elev. | Terrain |
|---|---|---|---|---|---|
| 1309125 (FCC record, opens in a new tab) | Guyed tower | 305 ft | Boldyn Networks | 1,137 ft | +112 ft vs. local terrain |
| 1312139 (FCC record, opens in a new tab) | Guyed tower | 304 ft | Boldyn Networks | 1,050 ft | +87 ft vs. local terrain |
| 1307632 (FCC record, opens in a new tab) | Lattice tower | 298 ft | Array Digital Infrastructure | 1,089 ft | +89 ft vs. local terrain |
| 1323835 (FCC record, opens in a new tab)Granted, not yet built | Lattice tower | 199 ft | MH Telecom | 1,182 ft | +123 ft vs. local terrain |
| 1334849 (FCC record, opens in a new tab)Granted, not yet built | Guyed tower | 124 ft | MH Telecom | 1,185 ft | +130 ft vs. local terrain |
Your options
Sell the remaining rent for one lump-sum payment and keep the land. The tower, the tenant, and your use of the rest of the property stay as they are.
We buy the home, lot, or acreage with the tower easement in place. No repairs, showings, or lender questions about the lease to work through.
FAQ
Our records show 5 FCC-registered antenna structures matched to Hollandale, all just outside the village, within five miles of its boundary. Most short monopoles and rooftop antennas are not required to register with the FCC, so the true number of wireless sites around this village is higher.
There is no citywide price; it depends on the lease itself, not the city: the current monthly rent, the annual escalator, the years left on the term and renewals, how many carriers are on the site, and how hard the site would be to replace. Enter your figures in our lease calculator for a modeled range.
Yes. A tower lease or easement usually stays with the land, so it transfers to whoever buys the property. Some buyers and lenders find that unfamiliar, which can slow a listing. We buy as-is, tower easement and all, and we can buy the whole property or only the lease income, depending on what you want to keep.
Boldyn Networks is the most common registered operator among the 5 FCC-registered structures matched to Hollandale. The remaining structures are registered to other operators, utilities, broadcasters, and public agencies. The operator named on the FCC record is not always the carrier paying your rent, so your lease and recent rent checks are the best guide to who your tenant is.
Of the 5 FCC-registered structures matched to Hollandale, 3 are guyed towers and 2 are lattice towers. The type is what the registrant reported to the FCC. Short monopoles and rooftop sites often never register, so they are undercounted here.
By registered height above ground, 2 are 100 to 199 ft, 1 is 200 to 299 ft, and 2 are 300 to 499 ft. The tallest, ASR 1309125, is 305 ft and registered to Boldyn Networks. Structures under 200 ft that are not near an airport usually do not have to register, so shorter sites are underrepresented in these counts.
Registrants report a construction date for 3 of the 5 structures matched to Hollandale. The most common decade is the 2010s, with 2, followed by the 2020s with 1. 2 have no construction date on file. The build date describes the structure, not your lease; the lease’s own start date and renewal terms are what matter in a sale.
Nearby markets
Distances are between place centers. All Wisconsin cities and towns
Get an offer
Share the address and whether you want to sell the lease, the property, or both. There is no obligation, and your details are used only to follow up about this property.